Earth Compute
not summed · shown, not summed As of August 25, 2026

Announced, not built

54.10 zettaFLOP/s
accreted

Signed orders, announced campuses, and gigawatts of substation capacity under construction. Larger than everything currently installed — and computing precisely nothing until it is energized. Power interconnects, not wafers, are the binding constraint.

Installed compute
54.10 ZFLOP/s
peak dense BF16 FLOP/s
Change, 1 year
+169.3%
54.7M H100e today
Vs. the headline
0.7x
shown for scale, never added
In the headline
No
context only — excluded by rule
← All constituents

Announced, not built over time

Installed compute in zettaFLOP/s, log scale, 2008 → present. A straight line on this axis means steady exponential growth; the slope is the doubling rate. History before the 2026 anchor is reconstructed — see the methodology.

How it's counted

Ordered and announced accelerator capacity not yet racked and powered — context only.

Roughly a year of forward shipments. Five individual AI datacenters are expected to cross 1 GW during 2026.

Why it is excluded: Becomes headline compute the day it is racked and powered; counting it now would double-count it then.

Source Epoch AI — Data on AI Data Centers

Full methodology →